Tripod Deployment Instructions 1 Place the tripod on the ground at your desired deployment location. 2 Release the locking tab on each leg. 3 Lower the height of the tripod leg to the desired position. 4 Remove the tripod stabilizer from the end of the leg. 5 Set the stabilizer to the correct height to level out the tripod mount. 6 Lower the tripod leg to its fixed position. (Repeat steps 2-6 for remaining tripod legs). 7 Confirm all three legs are in the locked position. 8 Attach the mast to the tripod by lining up the T-handle at the top and lower mast notch. 9 Tighten the T-handle on the mast clockwise until tight. 10 Raise or lower the tripod legs as necessary to ensure the bubble level is fully centered. 11 Tripod is ready for deployment. 12 Using the T-handle, make sure all mast sections are unlocked. 13a Make sure the handpump valve is in the closed position. 13b Elevate the mast. 14 The mast is elevated to desired height. 15 Turn the air relief valve on the hand pump counterclockwise to retract the mast. 16 Turn T-handles clockwise to lock all mast sections for transport. 17 Remove the mast from the tripod. 18 Release the locking tab on the tripod leg. 19 Position the tripod leg to the desired height for removal of the stabilizer. 20 Remove the stabilizer from the tripod leg. 21 Return the stabilizer to its original transport position. 22 Make sure all tripod leg stabilizers are locked in position. 23 Deployment is complete and ready for transport.